Blackgold Bina working compost log 中文

Every batch in the record

Batch logs

Each entry is one charge of one bin, from build to screened output, with the numbers as they came off the bench rather than as they were planned. Thermophilic batches ran above 55 °C; mesophilic ones never crossed it, and say so.

Ran hot (thermophilic)

Held 55 °C or above for at least three consecutive days at the core.

Batch log · Cured

Spent mushroom substrate, straight from a commercial grower

120 kg of spent oyster-mushroom blocks, already white with mycelium, and why the single most important step is breaking the blocks apart on the day they arrive.

Temperature curve: Spent mushroom substrate, straight from a commercial grower
Days to finish
86
C:N in
39:1
water in
60%
peak
67 °C

pallet bin · 22 Apr 2026 → 17 Jul 2026

Batch log · Cured

A 6 m windrow of municipal green waste, turned four times

What happens when you compost at the scale of a small van load: 1,400 L of output, a 78 °C peak, and the outer shell problem that costs you 15 % of the pile if you ignore it.

Temperature curve: A 6 m windrow of municipal green waste, turned four times
Days to finish
110
C:N in
41:1
water in
48%
peak
78 °C

windrow · 15 Mar 2026 → 03 Jul 2026

Batch log · Cured

Poultry litter and sawdust through a January cold snap

Six hens, 60 kg of litter, minus 9 °C nights, and the reason a poultry pile needs to be built in one single day rather than accumulated over a month.

Temperature curve: Poultry litter and sawdust through a January cold snap
Days to finish
148
C:N in
17:1
water in
49%
peak
58 °C

insulated bin · 11 Jan 2026 → 08 Jun 2026

Batch log · Curing

Office shred and delivery cardboard, 300 L insulated bin

Two months of office shreddings, 14 kg of delivery boxes and a nitrogen problem that had to be solved with 2.4 kg of grass, because paper alone will not heat.

Temperature curve: Office shred and delivery cardboard, 300 L insulated bin
Days to finish
96
C:N in
9:1
water in
35%
peak
64 °C

insulated bin · 27 Jun 2026 → 01 Oct 2026

Batch log · Cured

Horse manure and straw bedding, two pallet bins

A full winter's bedding from one stable box, 340 L of finished compost, and the anthelmintic question that decides whether it can go on a vegetable bed.

Temperature curve: Horse manure and straw bedding, two pallet bins
Days to finish
132
C:N in
32:1
water in
50%
peak
64 °C

pallet bin · 04 Apr 2026 → 14 Aug 2026

Batch log · Cured

Summer grass clippings balanced with corrugated cardboard

Nine mowings over eleven weeks, 780 g of nitrogen-rich clippings per mowing, and the two days the cage went sour because the grass went in wet and matted.

Temperature curve: Summer grass clippings balanced with corrugated cardboard
Days to finish
88
C:N in
23:1
water in
46%
peak
68 °C

wire bay · 19 May 2026 → 15 Aug 2026

Batch log · Cured

Oak leaf and coffee chaff in a 190 L tumbler

The first bin of the season: 22 kg of last autumn's oak leaves, 6 kg of coffee chaff from a roaster two streets away, and the moisture problem that nearly stalled week two.

Temperature curve: Oak leaf and coffee chaff in a 190 L tumbler
Days to finish
74
C:N in
32:1
water in
44%
peak
63 °C

tumbler · 08 Jun 2026 → 21 Aug 2026

Ran cool (mesophilic)

Never crossed the 55 °C line. Slower, more forgiving, and often the only realistic option in a cold climate or a small bin.

Batch log · Running

Hedge trimmings, chipped, and left for eight months

Not everything in a compost bay is trying to be a hot pile. 300 L of chipped privet and hawthorn took 240 days and produced the best mulch in the garden.

Temperature curve: Hedge trimmings, chipped, and left for eight months
Days to finish
240
C:N in
35:1
water in
39%
peak
48 °C

wire bay · 30 May 2026 → 25 Jan 2027

Batch log · Cured

A four-tray worm system on kitchen scraps, nine harvests in

No heat, no turning, no smell — but a 20 °C temperature ceiling that makes or breaks the whole system, and the pH drift that a strictly kitchen-scrap diet causes.

Temperature curve: A four-tray worm system on kitchen scraps, nine harvests in
Days to finish
180
C:N in
20:1
water in
65%
peak
22 °C

worm tray · 08 Feb 2026 → 07 Aug 2026

Batch log · Cured

Bokashi bran for 14 days, then a buried trench for 54 days

The indoor answer for a flat with no garden: 38 kg of food waste fermented in two buckets, buried in a 2 m trench, and the pH readings that decide when the soil is safe for roots.

Temperature curve: Bokashi bran for 14 days, then a buried trench for 54 days
Days to finish
68
C:N in
16:1
water in
41%
peak
25 °C

sealed bucket · 02 May 2026 → 09 Jul 2026

Batches are added as they finish, so the newest entry on this page is not the newest pile on the bench.